Home / Course catalog / TCPA: Precast Drainage Structure I... (TCPA-101724)

Texas Concrete Pipe Association (TCPA)

TCPA: Precast Drainage Structure Installation & Manufacturing - 17 October 2024 (TCPA-101724)


Description
Properly installing precast structures ensures they function properly while maintaining the integrity of the roadways by efficiently removing storm water. The greater one understands the precast installation structure process, the greater the savings in time and money. This workshop walks the students through
design, production, and installation of precast. There are several different processes used to produce high quality precast products. New and improved machines and methods are continually being developed. We will wrap up the class by touching on the more commonly used production methods.
Content
  • Precast Drainage Structure Installation & Manufacturing
  • PDIM Live Session - Introduction - 7:45am CST - 8:30am CST
  • MODULE 1:
  • PDIM - Lecture - Module 1 - Part 1 - 17:09 minutes
  • PDIM - Lecture - Module 1 - Part 2 - 08:09 minutes
  • PDIM Quiz - Module 1
  • PDIM Assignment - Module 1
  • PDIM Live Session - Module 1 - 9:45am CST - 10:15am CST
  • Module 2:
  • PDIM - Lecture - Module 2 - Part 1 - 15:13 minutes
  • PDIM - Lecture - Module 2 - Part 2 - 13:48 minutes
  • PDIM Quiz - Module 2
  • PDIM Assignment - Module 2
  • PDIM Live Session - Module 2 - 11:30am CST - 12:00pm CST
  • Course Evaluation
  • PDIM Required Class Evaluation - Overall
Completion rules
  • All units must be completed
  • Leads to a certificate with a duration: Forever